§ 23.25.314.0. Trenching, excavation, and backfill.  


Latest version.
  • Amend section 314.4 by adding, after the third sentence, the following:

    Backfill material shall be 3/8 " pea gravel or smaller. In the case of cast iron drain, waste and vent piping, the backfill material shall be ¾" gravel and earth or smaller.

( AO No. 2015-127, § 1, 4-1-16 )