§ 24.50.260. Building construction, demolition or repair—Storing materials or working on roof of covered walkway.  


Latest version.
  • If materials are stored or work is done on the roof of the walkway described in section 24.50.240, the ends and curb side of the roof shall be protected by a tight board fence three feet in height.

(CAC 10.44.270)