Construction documents for all buildings shall describe the exterior wall and roof
envelope in sufficient detail to determine compliance with this code. The construction
documents shall provide details of the exterior wall envelope as required, including
flashing, intersections with dissimilar materials, corners, end details, control joints,
intersections at roof, eaves or parapets, means of drainage, water-resistive membrane
and details around openings.
The construction documents shall include manufacturer's installation instructions
providing supporting documentation that the proposed penetration and opening details
described in the construction documents maintain the weather resistance of the exterior
envelope. The supporting documentation shall fully describe the exterior system which
was tested, where applicable, as well as the test procedure used.
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');