§ 21.80.400. Design standards—Electrical and telecommunication utilities.


Latest version.
  • The width and alignment of transmission easements within subdivisions shall conform to the utility corridor plan. The platting authority shall preclude structures or uses of land within or beneath areas of electrical or telecommunications ground or aerial easements that are incompatible with electrical distribution or transmission facilities.

    (AO No. 90-13(S))

    SLOPE CHART

    ADD FIGURE page 21.80-13

    Example: For a lot whose natural ground slope in 25 percent, the indicated area is 20,000 square feet and the indicated average width is 115 feet.