§ 21.20.003. Schedule of fees—Platting.  


Latest version.
  • The following fees shall be paid for the services described:

    A. Preliminary plat:
    1. Abbreviated plat (short plat) $2,830
    2. Abbreviated plat that only eliminates an interior lot line. $1,415
    3. All other preliminary plats except those with commercial fragmented lots. $4,530 plus $165 per lot or tract
    4. Preliminary plats with commercial fragmented lots. $4,530 plus $905 per commercial fragmented lot.
    B. Vacation:
    1. With preliminary plat $945
    2. Without preliminary plat $4,155
    3. Vacation fees are applicable whether a project requires one or multiple vacations. For example, a preliminary plat with two vacations is charged the same fee as a preliminary plat with one vacation.
    C. Variance:
    1. With preliminary plat $945
    2. Without preliminary plat $2,830
    3. Variance fees are applicable whether a project requires one or multiple variances. For example, a preliminary plat with two variances is charged the same fee as a preliminary plat with one variance.
    D. Final plat:
    1. Administrative - All final plats except an abbreviated plat that only eliminates an interior lot line. $2,645
    2. An abbreviated plat that only eliminates an interior lot line. $755
    3. Re-filing previously recorded final plan. $590
    4. Plat checking - No subdivision agreement:
    a. Abbreviated plat with survey waiver $415
    b. Abbreviated plat with survey $710
    c. Record of survey $415
    d. Commercial tract $710
    e. Other plats $710
    E. Modification or removal of plat note $1,415
    F. Minor amendments to previously approved preliminary plats, including time extensions. If found to be a major amendment by the platting board, the fee will be applied toward the applicable preliminary plat fee as provided in this section. $945
    G. Appeal of abbreviated plat to the platting board. $1,130
    H. Any other matter requiring a public hearing before the Platting Board $3,965

     

    (GAAB 21.05.090; AO No. 77-407; AR No. 78-12; AR No. 79-55; AO No. 82-49; AR No. 83-96; AR No. 83-289(S); AR No. 86-63; AR No. 91-64; AO No. 2001-145(S-1), § 23, 12-11-01; AO No. 2003-152S, § 21, 1-1-04; AO No. 2004-151, § 14, 1-1-05; AO No. 2010-81(S-1), § 41, 12-7-10, eff. 1-1-11; AO No. 2013-100, § 12, 1-1-14; AO No. 2018-100(S) , § 11, 1-1-19)

    Authority— Anchorage Municipal Code 3.40, 21.20.050; AO 77-407.

Editor's note

Section 54 of AO No. 2010-81(S-1), adopted December 7, 2010, states section 21.20.003 shall become effective upon approval without modification by the Planning and Zoning Commission pursuant to AMC section 21.10.015, but in any event shall not become effective earlier than January 1, 2011. Should the Planning and Zoning Commission modify any of the proposed amendments in the aforementioned section, the modifications shall be submitted to the Assembly for approval by separate ordinance.